[Federal Register Volume 85, Number 114 (Friday, June 12, 2020)]
[Notices]
[Pages 35929-35930]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-12719]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 4428-011]
Walden Hydro, LLC; Notice of Application Tendered for Filing With
the Commission and Soliciting Additional Study Requests and
Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 4428-011.
c. Date filed: May 29, 2020.
d. Applicant: Walden Hydro, LLC.
e. Name of Project: Walden Hydroelectric Project.
f. Location: On the Wallkill River, in the Village of Walden,
Orange County, New York. The project does not occupy any federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ms. Elise Anderson, Senior Environmental
Permitting Specialist, Walden Hydro, LLC, Enel Green Power North
America, Inc., 100 Brickstone Square, Suite 300, Andover, MA 01810;
Phone at (978) 447-4408 or email at Elise.Anderson@enel.com.
i. FERC Contact: Samantha Pollak at (202) 502-6419, or
samantha.pollak@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: July 28, 2020.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202)
502-8659 (TTY).
m. The application is not ready for environmental analysis at this
time.
n. The Walden Project consists of the following existing
facilities: (1) A 417-foot-long, V-shaped concrete dam topped with 2-
foot-high flashboards; (2) an impoundment with a surface area of 69
acres at the normal pool elevation of 321.3 feet National Geodetic
Vertical Datum of 1929 (NGVD29); (3) an intake structure consisting of
a 252-foot-long, 56-foot-wide, 18-foot-deep canal forebay; (4) four 40-
foot-long steel penstocks; (5) a 60-foot-long, 45-foot-wide, 29-foot-
high powerhouse containing three horizontal double-runner Francis
turbine units with ratings of 980 kilowatts (kW), 630 kW, and 500 kW,
respectively for a total rated capacity of 2,110 kW; (6) a 30-foot-
long, 37-foot-wide tailrace; (7) a 230-foot-long bypass reach
consisting primarily of bedrock; (8) a transmission line; (9) a
substation with a single-phase 12.5-kilovolt transformer; and (10)
appurtenant facilities.
The project operates in a run-of-river mode with a minimum flow of
31 cubic feet per second. The project has an average annual generation
of 3,333 megawatt-hours between 2012 and 2019.
o. A copy of the application may be viewed on the Commission's
website at http://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document (P-4428). For assistance, contact FERC
Online Support. At this time, the Commission has suspended access to
the Commission's Public Reference Room due to the proclamation
declaring a National Emergency concerning the Novel Coronavirus Disease
(COVID-19) issued by the President on March 13, 2020. For assistance,
contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866)
208-3676 or (202) 502-8659 (TTY).
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via
[[Page 35930]]
email of new filings and issuances related to this or other pending
projects. For assistance, contact FERC Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary schedule. Revisions
to the schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)--July 2020
Request Additional Information--July 2020
Issue Acceptance Letter--October 2020
Issue Scoping Document 1 for comments--November 2020
Request Additional Information (if necessary)--January 2021
Issue Scoping Document 2 (if necessary)--February 2021
Issue Notice of Ready for Environmental Analysis--February 2021
Commission issues EA--September 2021
Comments on EA--October 2021
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: June 8, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-12719 Filed 6-11-20; 8:45 am]