[Federal Register Volume 85, Number 121 (Tuesday, June 23, 2020)]
[Notices]
[Pages 37652-37653]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-13442]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2814-025]
Great Falls Hydroelectric Company, City of Paterson, New Jersey;
Notice of Application Ready for Environmental Analysis, and Soliciting
Comments, Recommendations, Terms and Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2814-025.
c. Date Filed: February 28, 2019.
d. Applicant: Great Falls Hydroelectric Company and the City of
Paterson, New Jersey, as co-licensees.
e. Name of Project: Great Falls Hydroelectric Project (Great Falls
Project or project).
f. Location: On the Passaic River, near the City of Paterson,
Passaic County, New Jersey. The project does not occupy federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Robert Gates, Senior Vice President of
Operations, Eagle Creek Renewable Energy, 65 Madison Avenue, Suite 500,
Morristown, NJ 07960; (973) 998-8400; [email protected]
and/or Ben-David Seligman, 2nd Assistant Corp. Counsel, City of
Paterson, 155 Market Street, Paterson, NJ; (973) 321-1366; email_
[email protected]
i. FERC Contact: Christopher Millard at (202) 502-8256; or email at
christopher.millard@ferc.gov.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and prescriptions
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
exception occurred on : 2020-13442.htm
exception occurred on : 2020-13442.htm
[email protected]">FERC[email protected], (866)
[[Page 37653]]
208-3676 (toll free), or (202) 502-8659 (TTY).
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted and is ready for
environmental analysis at this time.
l. The existing project works consist of: (1) The Society for the
Establishment of Useful Manufactures (S.U.M.) dam, an overflow granite
stone gravity structure about 315 feet long, with a maximum height of
15 feet and having a crest elevation of 114.6 feet mean sea level
(msl); (2) a reservoir with a surface area of 114.69 acres and a
storage capacity of 1,415 acre-feet at elevation 114.6 feet msl; (3) a
forebay inlet structure; (4) a headgate control structure containing
three trashracks and three steel gates; (5) three penstocks, each 8.5
feet in diameter and approximately 55 feet long; (6) a powerhouse
containing three turbine-generator units with a total rated capacity of
10.95 megawatts; (7) a 37-foot-long, 4.16-kilovolt (kV) underground
transmission line connecting the powerhouse to a 4.16/26.4-kV step-up
transformer which in turn is connected to a 26.4-kV transmission grid
via an approximately 30-foot-long, 26.4-kV underground transmission
line; (8) and appurtenant facilities.
The Great Falls Project is operated in a run-of-river mode. For the
period 2010 through 2018, the average annual generation at the Great
Falls Project was 17,484 megawatt-hours.
m. A copy of the application may be viewed and/or printed on the
Commission's website (http://www.ferc.gov), using the eLibrary link.
Enter the docket number, excluding the last three digits in the docket
number field to access the document. At this time, the Commission has
suspended access to the Commission's Public Reference Room, due to the
proclamation declaring a National Emergency concerning the Novel
Coronavirus Disease (COVID-19), issued by the President on March 13,
exception occurred on : 2020-13442.htm
exception occurred on : 2020-13442.htm
2020. For assistance, contact FERC Online Support at [email protected]">FERC[email protected], (866) 208-3676 (toll free), or (202) 502-8659
(TTY).
All filings must (1) bear in all capital letters the title
COMMENTS, REPLY COMMENTS, RECOMMENDATIONS, TERMS AND CONDITIONS, or
PRESCRIPTIONS; (2) set forth in the heading the name of the applicant
and the project number of the application to which the filing responds;
(3) furnish the name, address, and telephone number of the person
submitting the filing; and (4) otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005. All comments, recommendations,
terms and conditions or prescriptions must set forth their evidentiary
basis and otherwise comply with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the application directly from the
applicant. Each filing must be accompanied by proof of service on all
persons listed on the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
o. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Deadline for filing comments, August 2020.
recommendations, terms and conditions,
and prescriptions.
Reply comments due...................... September 2020.
Commission issues EA.................... January 2021.
Comments on EA due...................... February 2021.
------------------------------------------------------------------------
Dated: June 16, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-13442 Filed 6-22-20; 8:45 am]
BILLING CODE 6717-01-P