Green Mountain Power Corporation; Notice of Application Accepted
for Filing, Soliciting Motions To Intervene and Protests, Ready for
Environmental Analysis, and Soliciting Comments, Recommendations, Terms
and Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New License for Transmission Line Project.
b. Project No.: 12766-007.
c. Date filed: November 22, 2019.
d. Applicant: Green Mountain Power Corporation (Green Mountain
Power).
e. Name of Project: Clay Hill Road Line 66 Transmission Project
(Clay Hill Project).
f. Location: The Clay Hill Project is located along Clay Hill Road
in Windsor County, Vermont. The Clay Hill Project does not occupy any
federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: John Greenan, Green Mountain Power
Corporation, 2152 Post Road, Rutland, VT 05701; Phone at (802) 770-
2195, or email at John.Greenan@greenmountainpower.com.
i. FERC Contact: Bill Connelly, (202) 502-8587 or
william.connelly@ferc.gov. Deadline for filing motions to intervene and
protests, comments, recommendations, terms and conditions, and
prescriptions: 60 days from the issuance date of this notice;
[[Page 54556]]
reply comments are due 105 days from the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file
motions to intervene and protests, comments, recommendations, terms and
conditions, and prescriptions using the Commission's eFiling system at
https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://ferconline.ferc.gov/QuickComment.aspx. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY).
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
j. This application has been accepted for filing and is ready for
environmental analysis at this time.
k. Project Description: The existing Clay Hill Project consists of:
(1) A 2.3-mile-long, 12.5-kV, three-phase electrical line mounted on
top of Green Mountain Power's regional distribution line (Line 66)
along Clay Hill Road from Pole 115 to 62x; and (2) appurtenant
facilities. The project serves as a primary transmission line for the
North Hartland Hydroelectric Project No. 2816. Green Mountain Power is
not proposing any changes to project facilities or operation.
l. In addition to publishing the full text of this notice in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this notice, as well
as other documents in the proceeding (e.g., license application) via
the internet through the Commission's Home Page (http://www.ferc.gov)
using the eLibrary link. Enter the docket number excluding the last
three digits in the docket number field to access the document (P-
12766). At this time, the Commission has suspended access to the
Commission's Public Reference Room due to the proclamation declaring a
National Emergency concerning the Novel Coronavirus Disease (COVID-19)
issued by the President on March 13, 2020. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3673 or
(202) 502-8659 (TTY).
You may also register online at https://ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
m. Anyone may submit comments, a protest, or a motion to intervene
in accordance with the requirements of Rules of Practice and Procedure,
18 CFR 385.210, .211, and .214. In determining the appropriate action
to take, the Commission will consider all protests or other comments
filed, but only those who file a motion to intervene in accordance with
the Commission's Rules may become a party to the proceeding. Any
comments, protests, or motions to intervene must be received on or
before the specified comment date for the particular application.
All filings must: (1) Bear in all capital letters the title
PROTEST, MOTION TO INTERVENE, COMMENTS, REPLY COMMENTS,
RECOMMENDATIONS, TERMS AND CONDITIONS, or PRESCRIPTIONS; (2) set forth
in the heading the name of the applicant and the project number of the
application to which the filing responds; (3) furnish the name,
address, and telephone number of the person protesting or intervening;
and (4) otherwise comply with the requirements of 18 CFR 385.2001
through 385.2005. All comments, recommendations, terms and conditions
or prescriptions must set forth their evidentiary basis and otherwise
comply with the requirements of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from the applicant. A copy of any
protest or motion to intervene must be served upon each representative
of the applicant specified in the particular application. A copy of all
other filings in reference to this application must be accompanied by
proof of service on all persons listed in the service list prepared by
the Commission in this proceeding, in accordance with 18 CFR 4.34(b)
and 385.2010.
n. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
o. Procedural Schedule:
The application will be processed according to the following
schedule. Revisions to the schedule will be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Filing of interventions, protests, comments, October 2020.
recommendations, preliminary terms and
conditions, and preliminary fishway
prescriptions.
Commission issues Environmental Assessment...... May 2021.
Comments on Environmental Assessment............ June 2021.
------------------------------------------------------------------------
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of this notice.
Dated: August 27, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-19383 Filed 9-1-20; 8:45 am]
BILLING CODE 6717-01-P