[Federal Register Volume 85, Number 234 (Friday, December 4, 2020)]
[Notices]
[Page 78316]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-26712]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2530-057]
Brookfield White Pine Hydro LLC; Notice of Application Tendered
for Filing With the Commission and Establishing Procedural Schedule for
Licensing and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2530-057.
c. Date Filed: November 20, 2020.
d. Applicant: Brookfield White Pine Hydro LLC (White Pine Hydro).
e. Name of Project: Hiram Hydroelectric Project.
f. Location: The existing project is located on the Saco River in
the towns of Hiram, Baldwin, Brownfield, and Denmark within Oxford and
Cumberland Counties, Maine. The project does not affect federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Luke Anderson, Licensing Manager, Brookfield
White Pine Hydro LLC, 150 Main Street, Lewiston, ME 04240; Telephone
(207) 755-5600.
i. FERC Contact: Dianne Rodman, (202) 502-6077 or
dianne.rodman@ferc.gov.
j. This application is not ready for environmental analysis at this
time.
k. Project Description: The existing Hiram Project consists of a
255-acre, 7.5-mile-long impoundment at normal full pond elevation 349.0
feet; a 448-foot-long dam located at the top of Great Falls fitted with
an inflatable dam across the spillway crest; an intake that is integral
to the dam; a 320-foot-long, 15.5-foot-diameter penstock that
bifurcates to one 170-foot-long by 10-foot-wide penstock (to Unit 1),
and one 80-foot-long by 15.5-foot-diameter penstock (to Unit 2); a
powerhouse containing two turbine-generator units, Unit 1 rated at 2.4
megawatts (MW) and Unit 2 at 8.1 MW, for a total installed capacity of
10.5 MW; and appurtenant facilities. The project's transmission
facilities include: (1) Generator leads; (2) a substation located
adjacent to, and north of, the powerhouse; and (3) a transmission
circuit connecting the substation to a non-project switching station.
The project generates an annual average of 45,142 megawatt-hours.
White Pine Hydro proposes to continue to: operate the project in a
run-of-river mode from October 1 through November 15, with head pond
drawdowns limited to 1 foot or less from the full pond elevation, or
from the spillway crest when the inflatable dam is down. From November
16 through September 30, White Pine Hydro proposes to continue to cycle
daily operations whereby it would turn on and off its generating units
when inflow is sufficient to meet load demands, resulting in drawdown
of the head pond by up to 2 feet from the full pond elevation during
normal project operation, or from the spillway crest when the
inflatable dam is down. During this period, White Pine Hydro would
continue to provide a minimum flow of 300 cubic feet per second (cfs),
of inflow, whichever is less below the powerhouse.
White Pine Hydro proposes to remove from the current project
boundary 152 acres of land and 25 acres of water.
l. In addition to publishing the full text of this notice in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this notice, as well
as other documents in the proceeding (e.g., license application) via
the internet through the Commission's Home Page (http://www.ferc.gov)
using the eLibrary link. Enter the docket number excluding the last
three digits in the docket number field to access the document (P-
2530). At this time, the Commission has suspended access to the
Commission's Public Reference Room due to the proclamation declaring a
National Emergency concerning the Novel Coronavirus Disease (COVID-19)
issued by the President on March 13, 2020. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or
(202) 502-8659 (TTY).
m. You may also register online at https://ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural Schedule:
The application will be processed according to the following
preliminary Hydro Licensing Schedule. Revisions to the schedule may be
made as appropriate.
------------------------------------------------------------------------
Milestone Target Date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready January 2021.
for Environmental Analysis.
Filing of recommendations, March 2021.
preliminary terms and conditions,
and fishway prescriptions.
Reply Comments due................... May 2021.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: November 30, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-26712 Filed 12-3-20; 8:45 am]
BILLING CODE 6717-01-P